engine makeover, and more wood!

I managed to pull myself away from planking long enough to clean up and repaint the engine! She looks mighty sexy, and all went well aside from the spray can turned rocket that shot a volatile plume of red paint everywhere… We also stumbled upon a gold mine of clear fir when we were on a supply run in portland. The name of the company is Sustainable Northwest Woods I highly recommend them to anyone needing great quality fir at very reasonable prices. Not only were their prices great, but the staff was incredibly friendly and helpful! Check them out!  Sustainable Northwest Woods

These are very exciting days as they are the last days of topside planking! We are down to the last full run on the starboard side, and almost done with the 2nd to last run on the port. After that there are a couple runs from the bow that nib into the chine plank. Then all We have to do is spile the chine plank! I can practically taste the libations of the whiskey plank party!

DSCN7462

DSCN7458

DSCN7454 Lookin sexy!

DSCN7557 some of the beautiful fir from sustainable northwest woods fresh from the planer!

DSCN7550 planed down to planking thickness. Note all the saw dust!

We will be uploading the latest video as soon as I movie stops malfunctioning …

Thats all for now!

Seeing her for the first time!

I don’t have to much time on the interwebs today so this will have to be a short one. We finally rolled up the sides of the shed!  It was an incredible feeling standing back and really seeing the boat for the first time. Inside the shed you just can’t really see her. Everything is too cramped, all of her beautiful curves and sweeping lines are hidden from view. The pictures really don’t do her justice, but they’re better than nothing…

DSCN7400DSCN7397

 

More to come soon!

Installing intermediates, getting quotes for trucking, and making frittatas!

Ruth here:

“This past week has consisted of hunting for materials, messing around with sticky substances like tar and epoxy, more supply runs, an assembly line, and finally installing the 34 intermediates to the boat. She looks so solid! Garrett changed his mind 4 times before deciding the “perfect” method. 3 intermediates are of the first design and the rest are the final verdict besides the first 4 in the bow which are cut from 4×6’s …. no joke they’re beef-cakes

We’ve also sent out 4 requests to quote the cost of trucking the boat to the San Francisco Bay Area for completion in a boatyard. We are pretty confident we will be able to have her ready for transport in the fall, September or October. Really exciting stuff. In the slot that asks for the “Make” it felt weird to type “Homebuilt.”

DSCN7365

This has nothing to do with the boat and I can just picture Garrett shaking his head at me but I think it’s pretty cool and am quite proud of myself. Without an oven and no recipe I made a frittata! And with our neighbors duck eggs too! We even had some French Rose wine in the fridge to accompany and the beautifulest of mornings to enjoy it!

Cheers to progress!”

topside progress

We are well past the halfway point planking the topsides! The planks are going on really fast now, and they are all the way down to the gussets. Which means I have to stop my momentum to install intermediate frames… The intermediates are fames that extend from the sheer to the chine. There will be one intermediate between each set of frames. They are really easy to make, and go pretty fast but it’s a bit tedious seeing as there are 34 of them to do.

We had an awesome lumber picking day at home depot of all places. A few good hours of sorting through the lumber piles we came out with over 120 LF of clear doug fir 2×8’s! This will save us hundreds of dollars on bottom planking! (they will be ripped down to 2×6)

DSCN7282 Much more area covered than whats left to cover! You can see two of the intermediates in between the 2nd and 3rd / 3rd and 4th frames.

DSCN7284 So far this is the only plank that required more patience, and precision. This plank is notched to except two planks with more extreme taper. This helps make up for the extra surface area towards the bow.

DSCN7290 Nice view of her sheer line. The planks at the stern are simply run out past the transom, and will be trimmed later.

DSCN7296 I can’t wait until we can see her in the open not cooped up in the shed!

Thats all for now!

Moving on through April

DSCN7228

Ruth here:

“I wake up to a cool chill in the morning with the rising birds singing to the blue skies. The sun slowly overcomes the shadows of the dawn and warms my face as my coffee steams in my hands. Each day the boat grows like a child outgrowing her first pair of clothes. My mother and my aunt came to see her yesterday. My mom hasn’t been out since August seeing as she lives in California. My aunt saw her for the first time traveling all the way from Chicago. I love watching first impressions. In person, Rediviva towers over your head something the pictures just can’t capture.

The picture I snapped this morning is foggy because it was quite cold for the camera and then it died…. apologies

DSCN7274

I’ll let Garrett explain this next planking technique when I can get better pictures to illustrate. Not much area left to cover now on the Port side. Exciting!

It’s “easy” now to pull 10 hour work days and we are flying through planking. We scored on a few more pieces of wood for the bottom planking to come and even talked with a sail maker! Things are starting to get real.”

Cheers